Leland Private Residence

Leland, MI

Two levels of custom structural glass floor bridges integrated beside a dramatic indoor climbing wall — creating a transparent vertical connection between the home’s levels while delivering natural light through all three floors of a lakefront residence.

Timber-framed hallway crossing a structural glass floor bridge with Seeded Organic anti-slip panels, the second glass floor visible overhead

Project Highlights

View from above through two stacked structural glass floor bridges beside an indoor rock climbing wall, with black steel frames and glass railings

The Challenge

Project Overview

This lakefront residence in Leland, Michigan features one of the most architecturally distinctive interior glass floor installations in GFS’s residential portfolio. The home incorporates a full multi-story indoor climbing wall as a central feature — and the two glass floors were designed to sit directly beside it, creating a dramatic visual relationship between the transparent walkable surfaces and the textured stone wall ascending through the home’s full height.

Key Constraints

  • Engineer two levels of structural glass floor bridges to support residential live loads in a complex multi-story interior — with precise panel dimensions to fit within the surrounding timber and steel framework
  • Position both glass floors directly adjacent to the indoor climbing wall — requiring careful coordination with the climbing wall structure, steel framing, and timber construction to achieve accurate alignment at both levels
  • Maintain maximum transparency throughout — the glass floors needed to allow natural light to pass through all three levels of the home and preserve clear sightlines to the climbing wall from every floor
  • Select an anti-slip texture appropriate for interior residential use — Seeded Organic® was chosen for its textured, organic appearance that complements the home’s natural material palette of timber, stone, and steel
  • Coordinate glass railings at both levels to continue the transparent aesthetic and maintain a cohesive architectural language across the full installation

Why This Mattered

The climbing wall is the heart of this residence — a dramatic, vertical architectural feature that defines the home’s character. The glass floors were not incidental to this; they were integral to it. By placing transparent walkable surfaces at two levels beside the wall, GFS and White & Liebler Architects created a three-dimensional experience of the home’s vertical space — where the climbing wall can be observed simultaneously from above, at eye level, and from below through the glass. The result is a residence where circulation, recreation, and architecture are inseparable.

Looking up through a four-panel structural glass floor bridge to the climbing wall above, timber beams framing the recessed black steel frame

Frame & Structure

Glass Specification

Glass Railings

Panel Dimensions

Two identical glass floor units — upper and lower level — each with 4 glass panels:

Note: 4 glass panels per floor unit — both floors identical in size and panel configuration

In-House Engineering, Drafting & Design

The Leland project presented a coordination challenge that is easy to underestimate from the drawings: two structurally identical glass floor units, installed at two different levels within the same timber-framed residence, adjacent to an indoor climbing wall whose structure had to remain entirely independent of the glass floor system. Our engineering team specified the glass laminate configuration — low-iron triple-laminated tempered with PVB structural interlayers — to meet interior residential pedestrian live loads while maximizing light transmission through both floors simultaneously, since the daylighting effect of the installation depends on both units performing optically as well as structurally.

The black steel T-rafter frame components were specified and detailed in-house to integrate precisely within the timber-framed floor openings at each level, where the surrounding construction set fixed dimensional constraints that the glass panels and frame had to meet exactly. Our drafting team produced fabrication drawings for both units — each panel sized to 2′ – 10 15/32″ × 3′ – 10¾”, with 4 panels per unit — and coordinated the frame installation details with White & Liebler Architects and Twin Bay Glass to ensure clean alignment with the timber structure and the climbing wall framing at both levels. The Seeded Organic® anti-slip texture was also specified as part of the engineering package — selected not only for its ANSI A326.3 DCOF performance but for its visual compatibility with the home’s natural material palette of timber, stone, and steel.

Results & Impact

What Was Achieved